Is this possible: I make the constructions of a house. Then I send the position to my assistant, so she can make the 2D production drawings for this position. When she is finished, and she send back the position to me, can I update my old position with her drawings?
Can I do that if I have made changes in the constructions (and of course keep these changes)?